Hotline |
ICDs |
Build Status |
Build Loaded |
Wind Farms |
Mod/SW Notes |
Radar Operations Center
Pedestal Refurbishment
- The Plan:
- Full-Service Contract to cover entire spectrum of tasks
- Field Process
- Remove Pedestal from tower (requires radome/antenna removal)
- Replace Pedestal with remanufactured pedestal
- Re-install antenna and radome
- Test System
- Ship old pedestal to remanufacturing facility
- Pedestal Remanufacturing
- Complete tear down
- Inspect/Test wear components and replace as required
- Rebuild pedestal to OEM specifications
- Factory acceptance test
- Ship remanufactured pedestal as directed
- Limitations of a Round Robin approach:
- Only 4 spare pedestals (3 FSP and 1 LPP)
- Spares are seed stock for round robin process
Pedestal Refurbishment Images
Inside of a Pedestal
Pedestal Being Hoisted
Failed Bearings