Link to ROC Facebook Link to Twitter Link to Youtube    Skip Navigation Links
About The ROC
Field Requirements BranchExpand Field Requirements Branch
EngineeringExpand Engineering
OperationsExpand Operations
Program BranchExpand Program Branch
Current WeatherExpand Current Weather
Level I Data
Level II Data
Level III Data
Related LinksExpand Related Links
ROC Papers
Safety &
Environmental
Expand Safety &<br> Environmental
Site ID / MapsExpand Site ID / Maps
Software Build InformationExpand Software Build Information
SPG
Wind ProfilerExpand Wind Profiler
System
Documentation
Expand System<br>Documentation
WSR-88D ProgramExpand WSR-88D Program
Questions & Comments
 

Shelter Refurbishment




  • Most sites have 3 Shelters: RDA, Generator and TPMS
    • RDA, Generator shelters: original WSR-88D configuration
    • TPMS introduced 2001-2004
  • Shelter Structure:
    • Concrete walls with aggregate exterior, Steel door and door frame, galvanized vent hoods, rubber roof membrane
  • Proposed Refurbishment:
    • Replace roofs, doors, ventilation hoods
    • Clean and seal aggregate exterior
    • Paint exterior metal surfaces
    • Remove and replace caulk




Shelter Refurbishment
Shelter Refurbishment