Radar Operations Center
Traceability Drawings
RDA Drawing Traceability
The RDA equipment functional requirements are traceable to Section 3.7.2 of the SS. The Type B1 Development Specification 2830009, Pt 1 allocates these functions to specific CIs and further defines all required interfaces between these CIs. Refer to figure 3-1 of Type C1b Product Specification 2830009, Pt 2 for details on the RDA hardware LRUs. Refer to the ROC's Agile PLM system for the latest version.
RPG Drawing Traceability
The RPG equipment function requirements are traceable to Section 3.7.3 of the SS. The Type B1 Development Specification 2830007, Pt 1, allocates these functions to specific CIs and further defines all required interfaces between these CIs. Refer to figure 3-1 of Type C1b Product Specification 2830007, Pt 2 for details on the RPG hardware LRUs. Refer to the ROC's Agile PLM system for the latest version.