Hotline |
ICDs |
Build Status |
Build Loaded |
Wind Farms |
Mod/SW Notes |
Radar Operations Center
Service Life Extension Program (SLEP)
The Service Life Extension Program (SLEP) began in 2015 and concluded in 2024. SLEP consists of five projects to replace and refurbish major components of the radar: signal processor, transmitter, equipment shelters, pedestal, and backup generator. As a result of these sustaining engineering, hardware, and technology refresh investments, NEXRAD continues to be upgradable, reliable, and maintainable beyond 2035 or until a suitable replacement for the WSR-88D is deployed.
SLEP Downloads
File | Last Updated |
---|---|
Final - Pedestal Refurbishment Schedule | 07/25/2024 |
Final - Pedestal Refurbishment Map | 07/25/2024 |
Final - Generator Refurbishment Schedule | 08/03/2023 |
Final - Generator Refurbishment Map | 09/01/2023 |
NWSTC Signal Processor Informational Sheets | |
Maintenance Manual Downloads: 6-513, 6-513-1 or 6-518 | |
SLEP Webinar |